Technician using augmented reality goggles
Technician holding augmented reality goggles
Augmented reality sandbox
Orion capsule pressure vessel at KSC.
Orion spacecraft in integration hall.
Artemis I mission wet dress rehearsal pre-rollout
Artemis I first rollout
Spacecraft integration hall at KSC.
Launch team at Artemis I launch attempt
Artemis Orion crew module test article
Orion spacecraft full-scale model.
Spacecraft heat shield display at KSC
Mars rover model at Kennedy Space Center.
Mars 2020 rover Perseverance
Integration of Orion Capsule on Space Launch System
Magellan spacecraft on Shuttle in Assembly bldg
RASSOR Mars mining robot demonstration
Transiting Exoplanet Survey Satellite, February 2018
USA, Florida, Merritt Island, Kennedy Space Center, satellite in Space Shuttles Explorer
Saturn V Moon rocket at KSC.
3D printing space construction testing facility
NASA robot mock-up at KSC
Mercury-Redstone booster at KSC
Astronaut pipe cutter.
Apollo 14 command module at KSC.
Apollo command and service module at KSC.
Ranger spacecraft mock-up at KSC.
Apollo service module engine at KSC
Saturn V first stage erection, 1967
Saturn V first stage and Apollo spacecraft, 1968
Engineers in cleanroom tent.
SpaceX Falcon 9 rocket and Crew Dragon Resilience
New Horizon's spacecraft
Orion splashdown
Launch of space shuttle Atlantis, STS-30
Axiom-1 mission launch
宇宙から見た地球(NASA提供)
NASA astronaut wearing smartglasses on the ISS
OSIRIS-REx spacecraft preparations, 2016
Radar dome, Cape Canaveral, USA
Orion crew module test model, 2012
Orion spacecraft prior to first test flight, 2014
Apollo Lunar Module at KSC
Launch pad at Kennedy Space Center.
Flame trench at KSC launch pad
Space Shuttle Atlantis at KSC.
Saturn 1B rocket at Kennedy Space Center.
Space Shuttle Atlantis at KSC
Hubble Space Telescope engineering model.
Space Shuttle cockpit.
Aerial view of Kennedy Space Center.
Space Shuttle tank and boosters at KSC.
Space Shuttle tyres.
Launch pad flame deflectors.
Space Shuttle runway at KSC
Rocket launch pad and tower at KSC
Astrotech spacecraft processing building
Crawler transporter at KSC
Circuit array in laboratory test area.
Lunar Orbiter mock-up at KSC.
SpaceX Crew Demo-1 launch, March 2019
SpaceX Crew Demo-1 after launch, March 2019
Astronauts at SpaceX Demo-1 launch, March 2019
NASA meatball globe at KSC
Apollo 15 astronauts suiting up before launch, July 1971
Judy Sullivan, NASA engineer at Apollo 11 suit up
SpaceX Crew-5 prelaunch
SpaceX Crew-3 launch
Automotive engineer using a tablet for augmented reality
Orion spacecraft model
SpaceX Crew-3 astronauts being suited up
Artemis I, Mission Control Room
SpaceX Demo-1 news conference, March 2019
SpaceX Demo-1 pre-flight astronaut visit, March 2019
Orion Exploration Flight Test 1 preparations, 2014
Artemis I Orion spacecraft, flight day 13
Artemis I Orion spacecraft, flight day 20
Orion spacecraft recovery
Orion spacecraft launch abort testing, 2019
NASA SpaceX Crew-7 mission pre-flight
Control tower at Shuttle Landing Facility
International Sun-Earth Explorer satellite
Artemis I mission wet dress rehearsal rollout
Solar Orbiter launch
Installing sample tubes onto the Perseverance rover
Electric powerhouse of Glen Canyon Dam, Arizona, USA
ロケットの展示
Space shuttle Enterprise rollout
Launch of first space shuttle STS-1
First space shuttle STS-1
Pioneer I spacecraft on the launch pad
Boeing Orbital Flight Test-2 launch
Space shuttle Atlantis
Apollo 11 crew at transport to launch pad, July 1969
Dragon 2 spacecraft, Demonstration Mission 1
NASA astronaut Christa McAuliffe watching STS-61-A launch
SpaceX Crew-5 astronauts
STS-8 crew at Kennedy Space Center, Florida, USA
Space station plant system at KSC
USA, Florida, Merritt Island, Kennedy Space Center, old rockets in Rocket Garden
USA, Florida, Merritt Island, Kennedy Space Center, Space Shuttle Explorer
Apollo 12 launch preparations, 1969
Falcon Heavy first launch
NASA astronauts and T-38 trainer aircraft
Space Shuttle runway at KSC.
Vehicle Assembly Building interior at KSC
Hard spacesuit development model at KSC.
Rocket transporter engine piston.
Space Shuttle docking module.
Liquid hydrogen storage at KSC.
Radio masts on Vehicle Assembly Building
Apollo 11 rollout before launch, July 1969
Apollo 15 launch, July 1971
Mechanic using augmented reality
Orion spacecraft landing test
Super Guppy Turbine cargo aircraft
Engineer using augmented reality on a smartphone
NASA SpaceX Crew-7 walkout
Technicians preparing Geotail spacecraft
Mass spectrometer
Orion 3D printed mode.
Orion spacecraft post-flight acoustics testing, 2016
Astronauts Bob Behnken and Eric Boe
Architect wearing a virtual reality headset uses gestures
Automotive engineers working on an electric car
Automobile engineer working on electric car using a tablet
Automobile engineers designing an electric car using CAD
Automotive engineer using digital tablet
Automotive engineer working on electric car using tablet
Automotive engineer using a virtual reality headset
Engineering using AR headset working on an electric car
In automotive facility automobile design engineer
Technician wearing virtual reality headset
Doctor wearing VR headset and examining X-rays
Doctor holding virtual human heart
Doctor holding virtual human brain
Doctor touching virtual human brain
Doctor touching virtual globe
Doctor looking at virtual capsules
Doctor with stethoscope
Von Braun at Apollo 11 launch site, 1969
SPACE SHUTTLE CHALLENGER.
NASA SpaceX Crew-7 mission launch
Solar Orbiter launch, time-lapse image